What nobody does these days before buying a product or signing a contract or entering a gambling sweepstake or applying for a job.
While looking at the record label contract he signed, the musician suddenly noticed and read between the lines that he would not get a cent from any of the CDs sold with his music on it. But by then it was to late.
by AYB October 18, 2003
Get the read between the lines mug.Delta Air Lines will be merging with Northwest and then it will become the biggest airline in the world.
by I LOVE DELTA AIR LINES! August 9, 2008
Get the Delta Air Lines mug.by M.gmgmg June 27, 2023
Get the Bang my line mug.by Harry Hart June 6, 2022
Get the McDonalds hair line mug.How are things going with your girlfriend?
Great! You should see downstairs. It's like a pencil drawn line!
Great! You should see downstairs. It's like a pencil drawn line!
by Wagglejavelin November 16, 2012
Get the Pencil Drawn Line mug.by Spidalicka August 14, 2017
Get the offensive line coach mug.An MTR line that originates from its terminus at Whampoa and ends at its other terminus at Tiu Keng Leng.
History:
1979 - Modified Initial System from Kwun Tong to Tsim Sha Tsui is built.
1980 - Modified Initial System from Tsim Sha Tsui to Chater, including its cross-harbour section, is built.
1982 - Modified Initial System is divided into Tsuen Wan Line and Kwun Tong Line, with Waterloo and Argyle stations being interchange stations between the two lines. Kowloon Tong station becomes an interchange station with the KCR British Section. Prince Edward Station is built, being a third interchange station with the Tsuen Wan Line.
1985 - Waterloo and Argyle stations are renamed to Yau Ma Tei and Mong Kok respectively.
1989 - Kwun Tong Line from Kwun Tong to Quarry Bay, including its cross-harbour section, is built along with Lam Tin station. Quarry Bay Station becomes an interchange station with the Island Line.
2001 - Kwun Tong Line from Quarry Bay to North Point is built.
2002 - Tseung Kwan O Line from North Point to Po Lam is built, taking over part of the Kwun Tong Line, including its cross-harbour extension. Kwun Tong Line is rerouted to interchange with the Tseung Kwan O Line at Yau Tong and Tiu Keng Leng stations.
2016 - Kwun Tong Line from Yau Ma Tei to Whampoa is built.
2020 - Diamond Hill station becomes an interchange station with the Tuen Ma Line Phase 1.
2021 - Ho Man Tin Station becomes an interchange station with the Tuen Ma Line.
History:
1979 - Modified Initial System from Kwun Tong to Tsim Sha Tsui is built.
1980 - Modified Initial System from Tsim Sha Tsui to Chater, including its cross-harbour section, is built.
1982 - Modified Initial System is divided into Tsuen Wan Line and Kwun Tong Line, with Waterloo and Argyle stations being interchange stations between the two lines. Kowloon Tong station becomes an interchange station with the KCR British Section. Prince Edward Station is built, being a third interchange station with the Tsuen Wan Line.
1985 - Waterloo and Argyle stations are renamed to Yau Ma Tei and Mong Kok respectively.
1989 - Kwun Tong Line from Kwun Tong to Quarry Bay, including its cross-harbour section, is built along with Lam Tin station. Quarry Bay Station becomes an interchange station with the Island Line.
2001 - Kwun Tong Line from Quarry Bay to North Point is built.
2002 - Tseung Kwan O Line from North Point to Po Lam is built, taking over part of the Kwun Tong Line, including its cross-harbour extension. Kwun Tong Line is rerouted to interchange with the Tseung Kwan O Line at Yau Tong and Tiu Keng Leng stations.
2016 - Kwun Tong Line from Yau Ma Tei to Whampoa is built.
2020 - Diamond Hill station becomes an interchange station with the Tuen Ma Line Phase 1.
2021 - Ho Man Tin Station becomes an interchange station with the Tuen Ma Line.
by thealtf4psychic February 14, 2022
Get the Kwun Tong Line mug.